General guidelines for installing EnergyEdge® on a rough foundation
Energy
Edge rails can be used as the concrete form with a kicker system
(see picture to the left and middle below) or as a form liner (see
lower right picture). Energy Edge braces should be used
as rail connectors, occur within 18" of the joint or corner and 36"
on-center thereafter. Rails should be laid corners first and
straight runs last- minimizing cutting to the middle rail completing
the run. Align, level and mechanically secure the rails to the
kickers with screws on the exterior face of the rail. After
the concrete has been poured and finished, screws may by backed out
of the rails and kickers removed. Energy Edge products remain
in place, leaving a finished and insulated edge.
Click here to download a PDF Installation Guide

| Featured Projects | Product | Foundation |
Wall System |
Finishing System |
| Visit the project to view photos . Click "rough foundation" to return to this page. | ||||
| Habitat for Humanity- Wichita, KS | EE8mb | Trench | 2x4 stud | Siding |
| Paul Fisher School of Cosmetology | EE8fb | Curb/Trench | Metal | EIFS |
| Friends University Student Housing | EE8fb | Trench | 2x6 stud | Siding |
| Greensburg Incubator Building | EE8fb | Trench | ICF | Masonry |