EnergyEdge products can be installed on a trench footing or any other foundation that is not pre-leveled.

 

Rough Foundation Installation
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

General guidelines for installing EnergyEdge® on a rough foundation

 

Energy Edge rails can be used as the concrete form with a kicker system (see picture to the left and middle below) or as a form liner (see lower right picture).   Energy Edge braces should be used as rail connectors, occur within 18" of the joint or corner and 36" on-center thereafter.  Rails should be laid corners first and straight runs last- minimizing cutting to the middle rail completing the run.  Align, level and mechanically secure the rails to the kickers with screws on the exterior face of the rail.  After the concrete has been poured and finished, screws may by backed out of the rails and kickers removed.  Energy Edge products remain in place, leaving a finished and insulated edge.

Click here to download a PDF Installation Guide

 

 

 

 

 

 

 

 

 

 

 

Featured Projects Product Foundation

Wall System

Finishing System
Visit the project to view photos .  Click "rough foundation"  to return to this page.
Habitat for Humanity- Wichita, KS EE8mb Trench 2x4 stud Siding
Paul Fisher School of Cosmetology EE8fb Curb/Trench Metal EIFS
Friends University Student Housing EE8fb Trench 2x6 stud Siding
Greensburg Incubator Building EE8fb Trench ICF Masonry

 

 

 

Home Page Contact Us About EnergyEdge Site Map