General guidelines for installing EnergyEdge® on a pre-leveled foundation
Energy
Edge rails are used as the concrete form with the EnergyEdge bracing
system- no external supports/kickers are needed. Energy Edge braces should be used
as rail connectors, occur within 8" of the joint or corner and
18-24"
on-center thereafter. Rails should be laid corners first and
straight runs last- minimizing cutting to the middle rail completing
the run. Align, level the rails then mechanically secure the
braces to the
foundation with Tapcons, PAF, or duplex nails. The EnergyEdge
brace provided a "chair" to keep perimeter reinforcing in the proper
location. Pour & finish slab as usual. Energy Edge products remain
in place, leaving a finished and insulated edge.