EnergyEdge products can be installed on a monolithically placed slab.

         return to contractor page

 

Mono Pour Installation
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

General guidelines for installing EnergyEdge® on a monolithically placed slab

EnergyEdge rails can be used as the concrete form with a kicker system or as a form liner.  EnergyEdge braces should be used as rail connectors, occur within 18" of the joint or corner and 36" on-center thereafter.  Rails should be laid corners first and straight runs last- minimizing cutting to the middle rail completing the run.  Align, level and mechanically secure the rails to the kickers with screws on the exterior face of the rail.  After the concrete has been poured and finished, screws may be backed out of the rails and kickers removed.  EnergyEdge products remain in place, leaving a finished and insulated edge.

Click here to download a PDF Installation Guide

 

 

 

 

 

 

 

 

 

 

 

 

 

General guidelines for installing EnergyFlash® on a monolithically placed slab

EnergyFlash is a form liner specifically design for monolithic placement and retro-fit applications. The rail is designed to "wedge" horizontally onto a 1x and vertically onto a 8x or traditional form and kickers may be used.  Add mechanical fasteners to secure foam and slice 1 1/2" strips of rail to reverse wedge as anchors into concrete.   EnergyFlash remains in place, protecting insulation at grade.

 

Featured Projects Product Foundation

Wall System

Finishing System
Visit the project to view photos .  Click "mono pour"  to return to this page.
Habitat for Humanity EF- Wichita, KS EF210 Mono pour 2x4 stud Siding
Lakeside Residence- San Rafael, CA EE8fb Mono pour ICF & SIP Siding

 

    

 

 

 

 

 

 

 

 